ECDM Essay, Research Paper
Policy statement.
Descriptions of current waste generating processes
Descriptions of current and past practices used to eliminate or reduce the generation of toxic pollutants.
Rationale used behind each goal.
Options that have been considered, that are not economically or technically feasible.
The steps to implementing a Environmentally Conscious Management plan are as follows:
Establish a baseline
Identify Options
Evaluate Options
Implement
Continuously Improve
Establishing a Baseline
This is perhaps the most critical step, and perhaps the easiest to overlook.
The baseline consists of:
Determining the type and quantity of wastes generated at your facility.
Determining if the company is out of compliance with specific regulations.
Determining current corporate environmental policies.
It may be best to have an outside audit team (consultants) conduct the baseline investigation.
Determine current corporate environmental policies.
Examine corporate policy letters (good vs. bad)
Interview the corporate environmental staff
Interview plant employees
Investigate previous history of fines
Determine if the purchasing department has a list of chemicals not allowed into the plant.
Determine if environmental costs tracked by accounting.
Identify Options
Continuously ask why a particular waste stream is being produced.
Ask for input from the machine operators.
Query those who did the baseline.
Use outside vendors (salesmen).
Evaluate Options
Work on the most significant improvements first, not the easiest.
Ensure the option is economically feasible.
Ensure technical support is available.
Ensure the customer is aware of proposed process changes.
Choose the option that is technically feasible, economically viable, and fits with the future business plan.
Implement
Obtain funding, after documenting the return on investment.
Assemble a project team.
Outline project tasks and a schedule.
Make project assignments.
Track schedules and budgets.
Conduct pilot testing.
Complete final design and specifications
Document what has been done.
Obtain necessary permits
Obtain bids for equipment, construction, training.
Contract for equipment and services.
Prepare start-up plans.
Oversee equipment installation.
Certify & start up machinery.
Conduct training.
Complete manuals and “as-built” drawings.
Review performance of equipment, as operating vs. as promised.
! |
Как писать рефераты Практические рекомендации по написанию студенческих рефератов. |
! | План реферата Краткий список разделов, отражающий структура и порядок работы над будующим рефератом. |
! | Введение реферата Вводная часть работы, в которой отражается цель и обозначается список задач. |
! | Заключение реферата В заключении подводятся итоги, описывается была ли достигнута поставленная цель, каковы результаты. |
! | Оформление рефератов Методические рекомендации по грамотному оформлению работы по ГОСТ. |
→ | Виды рефератов Какими бывают рефераты по своему назначению и структуре. |